
Car park deck coatings & floor waterproofing
Trafficable membrane systems that keep water and chlorides out of car park decks, ramps and podiums, and stand up to tyres, turning and daily wear.
- Multi-storey car parks
- Rooftop decks
- Ramps & spirals
- Podium slabs
- Loading bays
Approved by RTA · DEWA · Dubai Municipality · DOT Abu Dhabi
Why car park decks need a membrane
A car park deck is exposed to almost everything that damages concrete: water and salts brought in on tyres, exhaust gases, oil, sun on the top deck and constant abrasion from turning wheels.
Water and chlorides travel through cracks and joints into the slab, corrode the reinforcement and leak onto the levels below. Uncoated decks also wear, dust and become slippery.
A deck coating system seals the slab with a flexible, crack-bridging membrane, then adds a hard-wearing, anti-skid wearing course and a UV-stable topcoat with the bay markings and walkways built in.

- 01
Stops leaks
A continuous membrane seals the slab and bridges hairline cracks.
- 02
Protects the steel
Keeps water and chlorides away from the reinforcement.
- 03
Anti-skid surface
Aggregate broadcast into the wearing coat for grip on ramps.
- 04
Clear and bright
Light colours, bay lines and walkways improve safety.

What the deck system keeps out
- Water
- Chlorides
- Oil & fuel
- 01ExposedRainwater, salts carried in on tyres and oil drips soak into the bare deck.
- 02LeakingWater (blue) works down through the slab to the steel and the level below.
- 03SealedPrimer, membrane, wearing coat and topcoat: the deck stays dry and grippy.
The system
- Topcoat
- Wearing coat
- Membrane
- Primer
Scroll to run the scene
How we apply it
Survey, preparation, application and inspection by one accountable Unimag team.
01Survey & testing
Moisture, cracks, joints and existing coatings are checked, and adhesion tests fix the preparation needed.
02Surface preparation
The deck is shot-blasted or ground to remove laitance and contamination and open the surface.
03Repairs & detailing
Cracks and joints are treated and upstands, drains and edges are detailed so water cannot get behind the system.
04Membrane & wearing coat
Primer, waterproof membrane and an aggregate-broadcast wearing coat are applied to specification.
05Topcoat & markings
The UV-stable topcoat goes on, followed by bay lines, arrows and walkways, then inspection.
Typical build-up
- Topcoat & markingsUV-stable, colour and lines
- Wearing coat + aggregateAnti-skid, abrasion resistant
- Waterproof membraneFlexible, crack-bridging
- PrimerSeals and bonds to the slab
- Prepared deck slabShot-blasted concrete
Typical system shown. Every system is specified per project to the manufacturer's data sheet.
Where we apply it
Typical structures across the UAE that need this protection.

Multi-storey car parks
Intermediate decks exposed to traffic and leaks.

Rooftop decks
Top decks exposed to sun, heat and rain.

Ramps & spirals
High-wear turning areas that need extra grip.

Podiums & loading bays
Slabs over occupied space and service areas.
Related projects
Work from Unimag's project record. Photos are illustrative until project photography is added.
All projectsQuestions we are asked
Can the car park stay open during the work?
Usually yes. We work in phased zones so parts of the car park can stay in use, and plan the sequence and curing times with the facility team.
What is the difference between a coating and a membrane system?
A simple coating mainly protects the surface. A deck waterproofing system adds a flexible, crack-bridging membrane under the wearing course, so it also stops water passing through cracks into the slab and the levels below.
Will the surface be slippery?
No. Aggregate is broadcast into the wearing coat to give an anti-skid finish, with a coarser texture on ramps where grip matters most.
Which systems do you use?
We are an approved applicator for Fosroc, Hempel, Jotun, BASF, Chemipaint, Stoncor, Corrotech and Isocrete. We recommend a system to suit the structure and use, or apply the system your consultant has specified.
What do we receive at handover?
Inspection and test records for the work carried out, together with the manufacturer's warranty documentation for the system applied.
Talk to our technical team
Send drawings, a specification or a BOQ.
Request a quote +971 4 333 8000info@unimag.aeRelated services
Protect your structure for the long term.
Share your drawings, specification or BOQ and our technical team will recommend a system and send a method statement and quotation.


