Skip to main content

Unimag Technical

Thermal & Acoustic Cladding by Unimag Technical in the UAE

Thermal cladding (EIFS) & acoustic ceiling systems

Insulated facade systems that keep heat out and acoustic ceilings that keep spaces quiet, from schools and gyms to the Burj Khalifa.

Used on
  • Facades & retrofits
  • Schools & gyms
  • Public buildings
  • Hotels & lobbies
  • Auditoriums

Approved by RTA · DEWA · Dubai Municipality · DOT Abu Dhabi

Less heat in, less noise around

In the UAE climate, a large share of a building's cooling load comes through its walls. An external insulation and finish system (EIFS) wraps the outside of the building in insulation boards, so the structure stays cooler and air-conditioning works less.

The boards are bonded and fixed to the wall, covered with a reinforced base coat and finished with a textured render in the chosen colour, giving a seamless, refreshed facade at the same time.

Acoustic ceiling systems use sound-absorbing boards and seamless acoustic plasters to control echo and noise in lobbies, halls and public spaces without visible joints.

Thermal & Acoustic Cladding being applied on site
Thermal & Acoustic Cladding in progress
  • 01

    Lower cooling load

    Insulation outside the structure reduces heat gain.

  • 02

    Fewer thermal bridges

    A continuous insulation layer around the building.

  • 03

    New facade finish

    Seamless render in the chosen colour and texture.

  • 04

    Quieter spaces

    Acoustic ceilings absorb echo and noise.

Keeping the heat outside

  • Solar heat
  • Hot air
  • Humidity
  1. 01Exposed wallSun and hot air hit the bare wall all day.
  2. 02Heat soakHeat (orange) travels through the wall into the building, raising cooling costs.
  3. 03InsulatedAdhesive, insulation board, base coat and render: the heat stays outside.

The system

  • Finish render
  • Base coat + mesh
  • Insulation board
  • Adhesive

How we install it

Survey, preparation, application and inspection by one accountable Unimag team.

  1. Survey & design: Thermal & Acoustic Cladding
    01

    Survey & design

    The substrate, openings and details are surveyed and the system and fixings are specified.

  2. Insulation boards: Thermal & Acoustic Cladding
    02

    Insulation boards

    Boards are bonded and mechanically fixed to the wall with staggered joints.

  3. Base coat & mesh: Thermal & Acoustic Cladding
    03

    Base coat & mesh

    A reinforced base coat with embedded glass-fibre mesh is trowelled over the boards.

  4. Finish render: Thermal & Acoustic Cladding
    04

    Finish render

    A textured finish render is applied in the specified colour.

  5. Acoustic ceilings: Thermal & Acoustic Cladding
    05

    Acoustic ceilings

    Acoustic boards and seamless acoustic plasters are installed and finished.

Typical build-up

  • Finish renderTextured, coloured, weatherproof
  • Base coat + meshReinforced, impact resistant
  • Insulation boardKeeps heat out
  • Adhesive & fixingsBond to the wall
  • Existing wallBlock or concrete

Typical system shown. Every system is specified per project to the manufacturer's data sheet.

Where we apply it

Typical projects and spaces across the UAE where we install it.

  • Thermal & Acoustic Cladding for Facade retrofits

    Facade retrofits

    Insulating and refreshing existing buildings.

  • Thermal & Acoustic Cladding for New buildings

    New buildings

    Schools, gyms and public facilities.

  • Thermal & Acoustic Cladding for Acoustic ceilings

    Acoustic ceilings

    Lobbies, halls and auditoriums.

  • Thermal & Acoustic Cladding for Landmark interiors

    Landmark interiors

    Seamless acoustic finishes.

Related projects

Work from Unimag's project record. Photos are illustrative until project photography is added.

All projects

Questions we are asked

What is EIFS?

An external insulation and finish system: insulation boards fixed to the outside of the wall, covered with a mesh-reinforced base coat and a decorative finish render. It insulates the building and gives it a new facade in one system.

Can EIFS be added to an existing building?

Yes. It is commonly used to retrofit existing buildings, insulating them and refreshing the facade without demolition.

Which insulation do you use?

The board type and thickness are chosen to suit the building, its fire-safety requirements and the energy target, and are specified with the system manufacturer and the consultant.

Do you install acoustic ceilings?

Yes, including seamless acoustic plaster ceilings. Unimag installed the STO acoustic ceiling system in the Burj Khalifa.

What do we receive at handover?

Inspection and test records for the work carried out, together with the manufacturer's warranty documentation for the system applied.

Talk to our technical team

Send drawings, a specification or a BOQ.

Request a quote +971 4 333 8000info@unimag.ae

Get the right system for your project.

Share your drawings, specification or BOQ and our technical team will recommend a system and send a method statement and quotation.