
Waterproofing
Seamless, trafficable membrane systems that keep water and chlorides out of car park decks, ramps, podiums, roofs and tanks, and stand up to traffic and UAE heat.
- Car Park & Floor Waterproofing
- Polyurea Coatings
Approved by RTA · DEWA · Dubai Municipality · DOT Abu Dhabi
Our waterproofing services
Each service has its own page with the system, process, applications and FAQs.
01Car Park & Floor Waterproofing
Trafficable membrane systems that keep water and chlorides out of car park decks, ramps and podiums, and stand up to tyres, turning and daily wear.
View service
02Polyurea Coatings
A seamless, highly elastic membrane sprayed on in a single pass that cures in seconds, for roofs, podiums, tanks and structures that need tough, fast waterproofing.
View service
Keep water out, keep the structure sound
Water is behind most problems in concrete structures. On car park decks and podiums it carries chlorides from vehicles and cleaning into the slab, where they attack the reinforcement from above.
A trafficable membrane seals the deck while taking tyre wear, turning and daily cleaning. Where speed matters, spray-applied polyurea cures in seconds and the area can return to use quickly.
Every system is chosen for the substrate, the traffic and the exposure, and detailed around joints, drains, upstands and penetrations, where most leaks start.

- 01
Seamless membranes
No laps or seams for water to find, including around details.
- 02
Trafficable
Decks and ramps stay in use, with anti-skid finishes where needed.
- 03
Fast return to use
Polyurea cures in seconds, so downtime is kept short.
- 04
Detailed properly
Joints, drains and upstands are treated as part of the system.
How we work
One accountable Unimag team from survey to handover.
- 01
Survey & test
We inspect the structure, test the concrete and find the cause of the problem before recommending anything.
- 02
Specify
We recommend a manufacturer-approved system and send a method statement and quotation.
- 03
Prepare & apply
Our own trained crews prepare the surface and apply the system to the data sheet.
- 04
Inspect & hand over
Thickness and adhesion are checked and recorded, and the records and warranty are handed over.
Related projects
From Unimag's project record. Photos are illustrative until project photography is added.
All projectsQuestions we are asked
Can a car park stay open while you work?
Usually yes. We work in phases, closing one zone at a time, so the rest of the car park stays in use.
What is polyurea?
A spray-applied elastomer that forms a seamless, highly elastic membrane and cures in seconds. It suits roofs, podiums, tanks and structures that need tough waterproofing with little downtime.
How long does a deck coating last?
It depends on the system, traffic and maintenance. We specify the system for the expected use and give the manufacturer's guidance on inspection and recoating.
Talk to our technical team
Send drawings, a specification or a BOQ.
Request a quote +971 4 333 8000info@unimag.aeGet the right system for your structure.
Share your drawings, specification or BOQ and our technical team will recommend a system and send a method statement and quotation.


